Q: Is there a total estimate aer/ug footage for the project?
As the project boundaries are still developing, there is not a current total. Please send in the NDA to obtain shape files of current project boundaries and footages.
Q:Is there an anticipated footage to be on US Naval Reservation, wetlands, state parks, or other area that will require special permitting?
A:We would stop short at the Naval and Park entrance where we currently have our Primary Meter. Engineering Company will need to obtain wetland permits.
Q: Does the PUD intend to utilize any existing assets/leased fiber? If so, what is the estimated footage?
A: Yes – approximately 17 miles between Quilcene and Discovery bay.
Q: What is the total HHP?
A: As the project boundaries are still developing, there is not a current total. Please send in the NDA to obtain shape files of current project boundaries and footages.
Q: Will pole loading be done by engineering contractor, PUD, or third party?
A: TBD
Q: Will as-built drawings/PDF be required or will GIS data only be acceptable?
A: As-builts can be done in GIS only
Q: What fiber management system does PUD currently use?
A: TBD