Logo Projects and Documents
PUD Home


Contact Us


Service Area


Power Authority


Projects & Documents


Rates


Water Quality FAQ

Budget

Links

Right click and "Save Target As" to your hard drive if you want to save these files.
All files are in Adobe Acrobat format unless stated otherwise.
Quick links below:

Financial
Power
Sewer
Timber
Water




Financial:
Financial Statements for the years ended December 31, 20011 and 2010

Financial
 Statements for the years ended December 31, 20010 and 2009

Financial
 Statements for the years ended December 31, 2009 and 2008

Financial Statements
for the years ended December 31, 2008 and 2007


Finan
cial Statements for the years ended December 31, 2007 and 2006.

FINAL Jefferson County Rate Study
-  This 2007 study was conducted to determine an appropriate rate structure to insure the long term fiscal stability of the PUD and continuity of its water systems and operations.  The study was used as the basis for the PUD's 2008 rate change
(Updated 1/5/2010).

Power:

Frequently Asked Questions regarding the PUD acquisition of PSE's electrical assets including our current progress, updated January 16, 2012.

PowerPoint presentations by D Hittle & Associates What's Next? and Acquisition Analysis from workshop at Tri-Area Community Center, January 14, 2009.

Preliminary Feasibility Study Public Utility District No. 1 of Jefferson County Electric System Acquisition - D. Hittle & Associates study, final version released in 2008.

Electric Service Evaluation for East Jefferson County - D. Hittle & Associates performed this study in 2000 to evaluate the existing electrical service in East Jefferson County. The evaluation was needed prior to any decisions involving the PUD entering the public power business.

Projected Economic Impacts of Adding Electrical Distribution Services to PUD#1 of Jefferson County This follow-up study was performed in 2005 by Seattle University professor Paul Sommers.  He looked at the impacts on both the PUD and the local community if the PUD provided public power minus capital facilities costs from a new or existing distribution system.

Sewer:

Instructions for use of grinder pumps at Beckett Point
- This is a flier for the Environmental One Grinder Pump used for system hookups at Beckett Point.


Timber:

Peterson Lake Timberland Management Plan
developed by Jerry Clarke, Jefferson County Conservation District, June 2010


Water:

June 2011 Water System Plan (Adopted 6/7/2010)
Volume 1 District and Regional Information (11 Mb)
Volume 2 Satellite Water Systems (25.64 Mb)
Volume 3 Wellhead Protection Plan for Satellite Systems
(5 Mb)
Volume 4 Appendicies - available on loan at office only

Lead Agency DNS and environmental checklist for JPUD water system plan update


More Water:
Archeological Survey for Water Line on Indian Island created for the PUD by Wessen Associates, May 2011

Water Demand Supply and Availability Study presentation (in PDF) given December 14 at the WRIA 17 Planning Unit meeting.

Lead agency DNS
and environmental checklist for Sparling #3 Water Treatment Plant.

DRAFT Groundwater Storage in the Chimacum Creek Basin - STEP 1
- A preliminary report determining the feasibility of injecting or infiltrating winter surface water flows so that the water will be available for use or to maintain stream flows (or both) during periods of high usage. Report was prepared by Golder Associates, April 2008.


Drilling and Hydrogeologic Characterization of a Deep Monitoring Well in the Chimacum Valley
-  This 2007 project funded largely by the Department of Ecology intended to penetrate the full thickness of glacial sediments in the Chimacum Valley for a future model and help determine if those formations were suitable for future study for storage or as future water supplies.


Reverse Osmosis (Desalinization) Feasibility Study - Contract was awarded to CH2MHill in 2006 to determine the feasibility of a desalinization plant in East Jefferson County. Several sites were chosen as candidates for future action.  Study was completed in February 2007.

Hydrogeologic Evaluation of Four Corners Well #1  - The PUD drilled a well in fall 2004 and had Pacific Groundwater Group perform a pump test on the well at Four Corners.